York Harbour Copper-Zinc-Silver-Cobalt Project. Newfoundland, Canada

LOCATION

27kms west of Corner Brook, NL

LAND SIZE

3,900 hectares

TARGET METALS

Copper, Zinc, Silver, Cobalt

  • Includes 11 zones (“A through K”) of copper-zinc enriched massive sulphides;
  • Expanded Licence Area – Now expanded to 3,900 hectares consisting of 5 licences and 156 claims
  •  Option agreement to acquire 100% interest in the York Harbour Mine Property by completing $3.0 million in accumulated work by March 2024.

Gallery

CHANNEL SAMPLES

DRILL HOLES YH21-04, YH21-06, YH21-08, YH21-09

DRILL HOLE YH21-13

DRILL HOLE YH21-14

DRILL HOLE YH21-18

DRILL HOLE YH21-19

York Harbour Property Claims Map
Historic size: 650 hectares
Post-Expansion size: 3,900 hectares

Exploration Plans

Phase 1 | COMPLETE

Field work completed in Phase 1 of the diamond drilling program included: borehole geophysical surveying, exploration diamond drilling, and interest to re-enter the underground mine workings.

Logan Drilling has completed 7 drill holes, totalling 1,222 meters. Phase 1 diamond drilling program was designed to confirm historical drilling results and reported grades for known lens of massive and semi-massive sulphide mineralization, primarily within the ‘A’ and ‘D’ zones. 

Highlights

  • YH21-04 with 9.51 m of 1.69% copper, 125.14 gpt cobalt, 0.13% zinc, and 1.43 gpt silver (including 1.54 m of 5.2% copper, 287.12 gpt cobalt, 0.07% zinc, and 2.57 gpt silver)
  • YH21-06 with 47.79 m of 0.85% copper, 91.82 gpt cobalt, 0.57% zinc and 1.53 gpt silver (including 1.60 m of 9.39% copper, 645.44 gpt cobalt, 0.18% zinc, and 6.9 gpt silver) (including 5.80 m of 3.52% copper, 283.03 gpt cobalt, 0.09% zinc, and 2.80 gpt silver)
  • YH21-08 with 6.6 m of 0.62% copper, 66.92 gpt cobalt, 0.65% zinc and 3.37 gpt silver
  • YH21-09 with 9.54 m of 1.69% copper, 238.73 gpt cobalt, 0.11% zinc and 2.83 gpt silver

Phase 2 | DRILLING IN PROGRESS

Phase 2 exploration program is currently underway with a continued diamond drilling program of  28 proposed holes totalling 4,325 meters. The focus is also on gaining access to the 400-level adit, and possibly testing a new massive sulphide target at the No 4 Brook showing.

No.4 Brook adit

The field crew is currently channel sampling the 15 metres of sheared semi-massive and massive sulphide mineralization exposed immediately adjacent to the No. 4 Brook adit, situated 1 km west of the Phase 2 drilling area and the former York Harbour Mine. 

400-level adit

In addition to the field work, the Company is currently investigating the use of a lidar-equipped drone, either ground-ambulatory or aerial, to survey the 400 Level adit this field season. The results of such a survey would be valuable for both identifying the condition of the adit for an ongoing application to permit the entry of the adit and to survey its dimensions for later drill hole placement.

Cautionary Statement and Forward-Looking Information

This website may contain “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities legislation. All information contained herein that is not historical in nature may constitute forward-looking information. Forward-looking statements herein include but are not limited to statements relating to the prospects for development of the Company’s mineral properties, and are necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently subject to business, market and economic risks, uncertainties and contingencies that may cause actual results, performance or achievements to be materially different from those expressed or implied by forward looking statements. Except as required by law, the Company disclaims any obligation to update or revise any forward-looking statements. Readers are cautioned not to put undue reliance on these forward-looking statements.

Douglas Blanchflower, B.Sc. (Hons), P. Geo. is a consulting geologist for the Company and has reviewed and approved the scientific and technical information in respect of the Company’s York Harbour Project contained in this website, and is qualified person in accordance with NI 43-101.